Support board
You'll want to make one of these.You'll want to make one of these.2x6x12" 1" hole & 2" hole for shafts to poke down into.
Date: 08/25/2006
Views: 17
|
Disassembled hydro unit
Entire assembly laid out in order.
Date: 08/25/2006
Views: 29
|
Install shaft & ball bearing.
Date: 08/25/2006
Views: 22
|
Swashplate installation
Make sure the swashplate is orientated the same way it came out.
Date: 08/25/2006
Views: 22
|
lower shaft & fixed swashplate installation
Date: 08/25/2006
Views: 25
|
cylinder block installation
Now is the time to pour your fluid over the blocks so they don't run dry at start up
Date: 08/25/2006
Views: 20
|
case halves before bolt down
Make sure the 2 dowel pins are in the grooves of the valve plates before bolting the halves together.
Date: 08/25/2006
Views: 26
|
charge pump rotor
Oil this good to before putting the cover on.
Date: 08/25/2006
Views: 20
|
Final assembly-note postion of charge pump housing.
Date: 08/25/2006
Views: 33
|